WE CONFIRM.
YOU APPROVE.
THEN WE BUILD.
We help customers in the USA order made-to-spec forged wheels without guessing about fitment, price, design, or production.
From your configuration to the factory.
You choose an existing design and its parameters, or ask us to develop a completely new design around your idea. We coordinate the specification, quote, deposit, production drawing, approval, manufacturing, and factory-direct delivery.
The website calculates the wheel price from the selected diameter, width, offset, bolt pattern, finish, and quantity. Sending that configuration is a request—not an automatic payment or permission to manufacture.
Every stage, explained.
Timelines begin at different milestones. The drawing starts after the deposit, manufacturing starts after drawing approval, and delivery starts after manufacturing.
Choose a design
Select a wheel design, diameter, width, offset, bolt pattern, finish, and quantity. The configurator shows the price for that specification.
Send your request
Submit the configured order with your vehicle and contact details. This does not charge your card or start production.
Confirm every detail
Our team contacts you to verify fitment, finish, vehicle details, delivery information, and the final order total.
Pay the deposit
After everything is agreed, we send a separate secure payment link for the required deposit.
Review your drawing
The factory prepares a production drawing in 2–5 days. You review the design and requested specification before approval.
Approve the drawing
We revise the drawing if needed. Manufacturing starts only after you approve the final drawing in writing.
Manufacturing
Your made-to-order wheels are manufactured in approximately 14–20 days after drawing approval.
Factory-direct delivery
After manufacturing, delivery from the factory to your address in the USA takes approximately 3 weeks or more.
No surprise production.
- Price before deposit We review the displayed configuration price, shipping, and applicable charges with you.
- Separate secure payment link A request never charges your card. The deposit link is sent only after confirmation.
- Drawing before manufacturing You receive a production drawing in approximately 2–5 days and approve it in writing.
- Factory-direct delivery After 14–20 days of manufacturing, delivery to the USA takes approximately 3 weeks or more.
Choose a path.
Configure an existing wheel design with an immediate price, or tell us what you want us to draw from scratch.
